Castlequinn Construction Services
Castlequinn Construction Services
  • Home
  • Gallery
  • Contact Us
  • More
    • Home
    • Gallery
    • Contact Us
  • Home
  • Gallery
  • Contact Us

Past Projects

Highlighted Projects

Gateway Arterial Flyover

Castlequinn Construction Services delivered Project Management and Supervision services on the Gateway Arterial Flyover project. The responsibilities Castlequinn Construction Services took ownership for included: 


  •  Planning and supervision of traffic control
  •   Set up of TTM 
  • Temporary Road signage
  •  Line marking
  •   Installation of PCB and zone guard barriers  
  • Formwork, Reinforcing and concrete works associated with the shoring of a 4-span flyover
  •   Widening of Gympie arterial road
  •  GST of subgrade
  •   Gravel pavement and asphalt 
  •  Part of the team awarded winner in the Repair, Restoration and Retrofitting category at the Queensland Concrete Institute Awards for Excellence. 

8 Mile Intersection Project

Castlequinn Construction Services delivered Supervision and Project Management Support on the 8 Mile Intersection project.  The responsibilities Castlequinn Construction Services took ownership for included:  

  • Project Management and Supervision   services on an overpass project   located approx. 10km from Warwick   at the New England and Cunningham   Highway intersection.  
  • Responsible for the planning, supervision and of X2 11-meter-high   embankments 
  • A new slip lane connecting the New   England to the Cunningham Highway
  •  Construction of a 2-span bridge over the Cunningham highway
  •  installation of multiple drainage structures 
  • Coordinate and managed all finishing   works including electrical street   lighting, asphalt, guard rail, line   marking, extruded barrier and Landscaping 

Cross River Rail

Castlequinn Construction Services are currently delivering Supervision and Labour Hire Services on the Cross River Rail project. 

As an integral part of the Rail Installation Team, we are 

  • Responsible for supporting the   project team with the installation of   rail both LVT, the first of its kind in   Australia and FST track from Boggo Road to Woolloongabba and from Woolloongabba to Albert Street   station in 4 separate tunnels. 
  • The installation of over 6000 Epoxy Grout pads as part of the Floating Slab Track System (FST)


Copyright © 2022 Castlequinn Construction Services - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept